FJOB will list all jobs that will be scheduled during a specific time. If you want to see what is scheduled on January 2, enter:
FJOB,FROM=0102,SPAN=24:
FJOB,JOB=jobname,FROM=0102,SPAN=24:
FJOB,FROM=0102,SPAN=24
FJOB DATE mm-dd-yy PAGE 0001
FORECAST FOR CA-7 JOBS
PERIOD : 01-02-yy AT 0000 HRS TO 01-02-yy AT 2400 HRS
JOB(S) : ALL
SYSTEM(S) : ALL
OPTIONS : BOTH JOB- AND DSN-TRIGGERED JOBS INCLUDED
CONNECTED OUTPUT NETWORKS NOT INCLUDED
HIGHEST JOB DATE AND TIME : YY0002/2103
HIGHEST JOB NAME : Last job determined to be scheduled
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
FJOB,FROM=0102,SPAN=24
FJOB DATE mm-dd-yy PAGE 0001
FORECAST FOR CA-7 JOBS
PERIOD : 01-02-yy AT 0000 HRS TO 01-02-yy AT 2400 HRS
A B C D E F G H
START DTTM END DTTM JOB SYS SCHED# SID TRIGGERING JOB/DSN RQMT
yy002/0100 yy002/0110 KMPA@CMS CMPMER SJ00002 001
yy002/0110 yy002/0130 KMPA003D CMPMER LEVLE1 001 KMPA@CMS
yy002/2100 yy002/2100 KMPA@OMS NMPMERC LEV002 001 KMPA003D NOEX
yy002/2100 yy002/2100 KMPA005D CMPMERC LEV002 001 KMPA003D NOEX
SFCI-00 REQUEST COMPLETED AT hh:mm:ss ON yy.ddd
Item Description - Starting on the left side:
- START DTTM - (Start Date/Time) is the day requested to forecast and calculated start time of the job listed under the column JOB
- END DTTM - (End Date/Time) is the calculated end date and time of the job listed under the column JOB
- JOB - Jobname of the job(s) scheduled to run with in the date /time requested.
- SYS - System(s) associated with the job(s) listed under the JOB column.
- SCHD# - Schedule Job Number assigned by CA-7 associated with the job(s) listed under JOB column.
- SID - Schedule Id which the job(s) listed under the JOB column. Each Job schedule contains a schedule id.
- TRIGGERING JOB/DSN - Indicates the job or dataset that triggers the job listed in under JOB column.
- RQMT - Identifies NON Executable jobs (NOEX), JCL Override (JCLO), Schedule turned off (OFF), Schedule Skipped (SKP)